Multi-pump Test Rig Fluid Lab Equipment Hydromechanics Experiment Equipment

Multi-pump Test Rig Fluid Lab Equipment Hydromechanics Experiment Equipment

ZF1128A Multi-pump Test Rig Fluid Lab Equipment Hydromechanics Experiment Equipment

Brand: Shouldshine
Model:ZF1128A
The Design should allow the student to demonstrate the principle operating charcteristics of different types of pumps.
The unit should vome with 2 centrifugal pumps and a positive displacement pump
the unit should be incorporate with appropriate pipe work and tanks to make the operation self contained the unit should have manually operated valve and pipe work should be arrange for rapid and safe selction of any one test pump. Measurment sensors are included to monitor the pump speed, power pump head and flowrate.
The unit should be self contained constructed on epoxy coated steel frame and paltform with lockable wheels.
The control box should be protected against the water splashes
Process pipes should be 1 inches
Dispalcement pump : Pipe size 1/2 Inches
Horizontal single stage Centrifugal Pump:
Capacity : 30 LPM
Head : 10 M
Eelctrical : 415 V AC /3 Phase / 50 Hz
Vertical Multistage Centrifugal Pump:
Capacity : 50 LPM
Head : 30 M
electrical : 415V AC /3 Phase /50 Hz
Gear Pump
Capacity : 8.5 LPM @10 bar
electrical : 415V AC /3 Phase /50 Hz
Water Tank
Capacity : 100L
Material : Stainless Steel
Oil Tank
CAPACITY : 30 L
Material : Stainless Steel
Instruments: The unit shoulf be fitted with all the necessary measuring devices for measuring flowrates, Pump speeds and motor power
OVER ALL DIMENSION:
Length : 2.42 m
Width : 1.20 m
Height : 1.82 m

  • Description
  • Inquiry

ZF1128A Multi-pump Test Rig Fluid Lab Equipment Hydromechanics Experiment Equipment

Brand: Shouldshine
Model:ZF1128A
The Design should allow the student to demonstrate the principle operating charcteristics of different types of pumps.
The unit should vome with 2 centrifugal pumps and a positive displacement pump
the unit should be incorporate with appropriate pipe work and tanks to make the operation self contained the unit should have manually operated valve and pipe work should be arrange for rapid and safe selction of any one test pump. Measurment sensors are included to monitor the pump speed, power pump head and flowrate.

We will contact you within 1 working day, please pay attention to the email.